Welcome to Auto, Motorcycle Parts & Accessories official website!

Air Filter Shipments: Price Watch in Poland

Source:News / Time:2026-09-18

Air Filter Shipments: Price Watch in Poland

Poland. Buyers working on air filter shipments in Poland have had to re-plan the current season. The change did not arrive all at once — it showed up first in lead time, then in price, and only afterwards in the paperwork. This report sets out what moved, why it moved, and what it means for anyone placing an order in the next few weeks.

The short version: the specification that worked last season is not automatically the specification that works now. Programmes that kept a written specification and an approved sample adjusted in days; programmes that did not are still arguing about reorders that did not match the approved sample.

Air Filter Shipments in Poland

What moved

TopicAir Filter Shipments
MarketPoland
FocusPrice Watch
Period coveredthe current season
Change recorded8% against the previous buying round
Typical lead time now20-24 weeks ex-factory
MOQ pressure1,000 pieces per specification
DocumentationECE R90 referenced in most enquiries

Why it happened

  • Input cost followed — the base material moved by roughly 8% before anyone adjusted the quotation.
  • Capacity moved first: factories that were quoting 18 weeks are now quoting 24 weeks.
  • Specification changes were approved verbally instead of in writing, and never reached production.
  • Freight and clearance added a second, less visible cost that most buyers discovered late.

Air Filter Shipments report

What buyers are doing about it

  1. Re-confirming the written specification before the next order instead of after it.
  2. Holding a golden sample at the factory as the reorder reference.
  3. Booking inspection before the balance payment, not after the container ships.
  4. Consolidating part numbers so freight per piece stays sensible.
  5. Asking for the test report with the goods rather than as a separate favour.

Outlook

Most of the enquiries we see from Poland point the same way for the current season: volume stays, but the tolerance for an undocumented change does not. Expect documentation to stay the deciding factor rather than unit price.

Practical notes for this market

  • Confirm the model year and market version before ordering — regional variants are the usual cause of a wrong first order.
  • State the duty cycle in writing; track days is not the same specification as occasional use.
  • Sampling takes 14 working days, and each revision adds about 3 days.
  • Keep ECE R90 documentation with the shipment record.

Questions buyers ask

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

Can you match an existing sample?

Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.

How long does sampling take?

Samples leave the factory in 14 working days, and each revision round adds about 3 days once you have seen the first piece.

What is the minimum order quantity?

The standard MOQ is 1000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.

Ask for the current catalogue and the specification sheet for this line.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation