Welcome to Auto, Motorcycle Parts & Accessories official website!

Off-Road LED Bar Specification Example for Workshop Replacements: Two-Piece Construction

Source:Durable Electric Bicycle Tire / Time:2026-09-18

Off-Road LED Bar Specification Example for Workshop Replacements: Two-Piece Construction

This is a worked specification for off-road led bar in a two-piece construction programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.

The two-piece construction version exists because the duty cycle on workshop replacements is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually a specification nobody had written down.

Off-Road LED Bar

Example specification

ItemOff-Road LED Bar
ApplicationWorkshop Replacements
VersionTwo-Piece Construction
Base materialPU Leather
Controlled dimensions4 key dimensions, recorded per lot
Tolerance band±0.05 mm
Finishpowder coated
MOQ2,000 pieces per specification
Sampling7 working days, 3 days per revision
ComplianceIATF 16949

How the example is built up

  1. Start from the duty cycle, not from the catalogue photograph.
  2. Fix the base material in writing — PU Leather, in this example.
  3. List the dimensions that are actually controlled and the tolerance on each.
  4. Name the finish and what it has to survive.
  5. State the inspection level and who pays when a lot fails.

Off-Road LED Bar example

Processes involved

  • die casting
  • ultrasonic cleaning
  • electroplating
  • shot blasting
  • assembly line testing
  • powder coating

Where this example applies

Programmes that run two-piece construction most often specify this build for workshop replacements. Related applications include long-haul trucks, emergency vehicles, assembly programmes, construction equipment, agricultural trailers.

Checks before packing

  • Dimensional report against the approved drawing.
  • AQL 2.5 sampling on the finished lot.
  • Finish inspection under agreed lighting.
  • Carton drop test on the first lot of a new packing specification.

Questions buyers ask

How long does sampling take?

Samples leave the factory in 7 working days, and each revision round adds about 3 days once you have seen the first piece.

Can the specification be held on file?

Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the IATF 16949-compliant build instead of a fresh interpretation.

Do you handle mixed containers?

Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 2000 pieces per line.

What testing is included?

Standard lots ship with dimensional and hardness reports. IATF 16949 documentation is issued with the shipment when your market requires it.

Tell us the model, the fitment and the quantity and we will hold a production slot for you.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top