Strut-Type Shock Absorber Specification Example for Boat Trailers: Two-Piece Construction
Strut-Type Shock Absorber Specification Example for Boat Trailers: Two-Piece Construction
This is a worked specification for strut-type shock absorber in a two-piece construction programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.
The two-piece construction version exists because the duty cycle on boat trailers is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually documentation that arrived after the container shipped.

Example specification
| Item | Strut-Type Shock Absorber |
|---|---|
| Application | Boat Trailers |
| Version | Two-Piece Construction |
| Base material | PVC Coated Fabric |
| Controlled dimensions | 3 key dimensions, recorded per lot |
| Tolerance band | ±0.5 mm |
| Finish | as machined |
| MOQ | 500 pieces per specification |
| Sampling | 10 working days, 5 days per revision |
| Compliance | E-mark |
How the example is built up
- Start from the duty cycle, not from the catalogue photograph.
- Fix the base material in writing — PVC Coated Fabric, in this example.
- List the dimensions that are actually controlled and the tolerance on each.
- Name the finish and what it has to survive.
- State the inspection level and who pays when a lot fails.

Processes involved
- powder coating
- shot blasting
- injection moulding
- die casting
- surface grinding
- electroplating
Where this example applies
Programmes that run two-piece construction most often specify this build for boat trailers. Related applications include assembly programmes, passenger cars, emergency vehicles, off-road bikes, scooter fleets.
Checks before packing
- Dimensional report against the approved drawing.
- AQL 1.5 sampling on the finished lot.
- Finish inspection under agreed lighting.
- Carton drop test on the first lot of a new packing specification.
Questions buyers ask
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
How long does sampling take?
Samples leave the factory in 10 working days, and each revision round adds about 5 days once you have seen the first piece.
What is the minimum order quantity?
The standard MOQ is 500 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
Ask for the current catalogue and the specification sheet for this line.



