Welcome to Auto, Motorcycle Parts & Accessories official website!

Snow Chains For Tires Specification Example for Racing Teams: Waterproof Version

Source:Wireless Backup Camera / Time:2026-09-18

Snow Chains For Tires Specification Example for Racing Teams: Waterproof Version

This is a worked specification for snow chains for tires in a waterproof version programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.

The waterproof version version exists because the duty cycle on racing teams is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually inconsistent hardness between lots.

Snow Chains For Tires

Example specification

ItemSnow Chains For Tires
ApplicationRacing Teams
VersionWaterproof Version
Base materialPowder Coated Steel
Controlled dimensions6 key dimensions, recorded per lot
Tolerance band±0.2 mm
Finishpowder coated
MOQ500 pieces per specification
Sampling7 working days, 5 days per revision
ComplianceISO/TS 16949

How the example is built up

  1. Start from the duty cycle, not from the catalogue photograph.
  2. Fix the base material in writing — Powder Coated Steel, in this example.
  3. List the dimensions that are actually controlled and the tolerance on each.
  4. Name the finish and what it has to survive.
  5. State the inspection level and who pays when a lot fails.

Snow Chains For Tires example

Processes involved

  • assembly line testing
  • injection moulding
  • rubber vulcanisation
  • gravity casting
  • laser cutting
  • die casting

Where this example applies

Programmes that run waterproof version most often specify this build for racing teams. Related applications include agricultural trailers, construction equipment, city buses, assembly programmes, rental motorcycles.

Checks before packing

  • Dimensional report against the approved drawing.
  • AQL 1.5 sampling on the finished lot.
  • Finish inspection under agreed lighting.
  • Carton drop test on the first lot of a new packing specification.

Questions buyers ask

Do you handle mixed containers?

Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 500 pieces per line.

How long does sampling take?

Samples leave the factory in 7 working days, and each revision round adds about 5 days once you have seen the first piece.

How is packing specified?

Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

Ask for the current catalogue and the specification sheet for this line.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top