Welcome to Auto, Motorcycle Parts & Accessories official website!

Anti Theft Lock Specification Example for Export Programmes: Two-Piece Construction

Source:Electric Boat Engine / Time:2026-09-18

Anti Theft Lock Specification Example for Export Programmes: Two-Piece Construction

This is a worked specification for anti theft lock in a two-piece construction programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.

The two-piece construction version exists because the duty cycle on export programmes is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually a supplier who changed material without saying so.

Anti Theft Lock

Example specification

ItemAnti Theft Lock
ApplicationExport Programmes
VersionTwo-Piece Construction
Base materialChromed Steel
Controlled dimensions6 key dimensions, recorded per lot
Tolerance band±0.2 mm
Finishzinc plated
MOQ3,000 pieces per specification
Sampling14 working days, 5 days per revision
ComplianceTUV

How the example is built up

  1. Start from the duty cycle, not from the catalogue photograph.
  2. Fix the base material in writing — Chromed Steel, in this example.
  3. List the dimensions that are actually controlled and the tolerance on each.
  4. Name the finish and what it has to survive.
  5. State the inspection level and who pays when a lot fails.

Anti Theft Lock example

Processes involved

  • surface grinding
  • rubber vulcanisation
  • assembly line testing
  • gravity casting
  • laser cutting
  • shot blasting

Where this example applies

Programmes that run two-piece construction most often specify this build for export programmes. Related applications include racing teams, municipal fleets, dealership service, utility trailers, workshop replacements.

Checks before packing

  • Dimensional report against the approved drawing.
  • AQL 2.5 sampling on the finished lot.
  • Finish inspection under agreed lighting.
  • Carton drop test on the first lot of a new packing specification.

Questions buyers ask

Do you handle mixed containers?

Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 3000 pieces per line.

How is packing specified?

Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.

Can you match an existing sample?

Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.

How long does sampling take?

Samples leave the factory in 14 working days, and each revision round adds about 5 days once you have seen the first piece.

Share a sample or a drawing and we will quote against a written specification, not against a photograph.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top