Otr Tire Tools Specification Example for Workshop Replacements: Long Life Version
Otr Tire Tools Specification Example for Workshop Replacements: Long Life Version
This is a worked specification for otr tire tools in a long life version programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.
The long life version version exists because the duty cycle on workshop replacements is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually a specification nobody had written down.

Example specification
| Item | Otr Tire Tools |
|---|---|
| Application | Workshop Replacements |
| Version | Long Life Version |
| Base material | PVC Coated Fabric |
| Controlled dimensions | 3 key dimensions, recorded per lot |
| Tolerance band | ±0.5 mm |
| Finish | painted |
| MOQ | 200 pieces per specification |
| Sampling | 14 working days, 3 days per revision |
| Compliance | RoHS |
How the example is built up
- Start from the duty cycle, not from the catalogue photograph.
- Fix the base material in writing — PVC Coated Fabric, in this example.
- List the dimensions that are actually controlled and the tolerance on each.
- Name the finish and what it has to survive.
- State the inspection level and who pays when a lot fails.

Processes involved
- injection moulding
- assembly line testing
- surface grinding
- sintering
- cold forging
- heat treatment
Where this example applies
Programmes that run long life version most often specify this build for workshop replacements. Related applications include boat trailers, scooter fleets, export programmes, three-wheelers, off-road bikes.
Checks before packing
- Dimensional report against the approved drawing.
- AQL 2.5 sampling on the finished lot.
- Finish inspection under agreed lighting.
- Carton drop test on the first lot of a new packing specification.
Questions buyers ask
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
What testing is included?
Standard lots ship with dimensional and hardness reports. RoHS documentation is issued with the shipment when your market requires it.
What is the minimum order quantity?
The standard MOQ is 200 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
Send the specification you are working to and we will confirm what we can match, what we would change and why.



