Welcome to Auto, Motorcycle Parts & Accessories official website!

Fuel Cooling System Specification Example for Workshop Replacements: High Performance

Source:Hydraulic Engine Mount / Time:2026-09-18

Fuel Cooling System Specification Example for Workshop Replacements: High Performance

This is a worked specification for fuel cooling system in a high performance programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.

The high performance version exists because the duty cycle on workshop replacements is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually reorders that did not match the approved sample.

Fuel Cooling System

Example specification

ItemFuel Cooling System
ApplicationWorkshop Replacements
VersionHigh Performance
Base materialPolypropylene
Controlled dimensions3 key dimensions, recorded per lot
Tolerance band±0.2 mm
Finishpainted
MOQ1,000 pieces per specification
Sampling7 working days, 3 days per revision
ComplianceECE R90

How the example is built up

  1. Start from the duty cycle, not from the catalogue photograph.
  2. Fix the base material in writing — Polypropylene, in this example.
  3. List the dimensions that are actually controlled and the tolerance on each.
  4. Name the finish and what it has to survive.
  5. State the inspection level and who pays when a lot fails.

Fuel Cooling System example

Processes involved

  • die casting
  • electroplating
  • heat treatment
  • cold forging
  • laser cutting
  • CNC machining

Where this example applies

Programmes that run high performance most often specify this build for workshop replacements. Related applications include municipal fleets, dealership service, long-haul trucks, assembly programmes, camper conversions.

Checks before packing

  • Dimensional report against the approved drawing.
  • AQL 2.5 sampling on the finished lot.
  • Finish inspection under agreed lighting.
  • Carton drop test on the first lot of a new packing specification.

Questions buyers ask

Can the specification be held on file?

Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the ECE R90-compliant build instead of a fresh interpretation.

Can you match an existing sample?

Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.

How long does sampling take?

Samples leave the factory in 7 working days, and each revision round adds about 3 days once you have seen the first piece.

What testing is included?

Standard lots ship with dimensional and hardness reports. ECE R90 documentation is issued with the shipment when your market requires it.

Share a sample or a drawing and we will quote against a written specification, not against a photograph.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top