Sleeve Auto Bearing Specification Example for Fleet Maintenance: OEM Replacement
Sleeve Auto Bearing Specification Example for Fleet Maintenance: OEM Replacement
This is a worked specification for sleeve auto bearing in a oem replacement programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.
The oem replacement version exists because the duty cycle on fleet maintenance is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually reorders that did not match the approved sample.

Example specification
| Item | Sleeve Auto Bearing |
|---|---|
| Application | Fleet Maintenance |
| Version | OEM Replacement |
| Base material | Tempered Glass |
| Controlled dimensions | 4 key dimensions, recorded per lot |
| Tolerance band | ±0.1 mm |
| Finish | as machined |
| MOQ | 3,000 pieces per specification |
| Sampling | 10 working days, 3 days per revision |
| Compliance | ISO/TS 16949 |
How the example is built up
- Start from the duty cycle, not from the catalogue photograph.
- Fix the base material in writing — Tempered Glass, in this example.
- List the dimensions that are actually controlled and the tolerance on each.
- Name the finish and what it has to survive.
- State the inspection level and who pays when a lot fails.

Processes involved
- die casting
- electroplating
- rubber vulcanisation
- laser cutting
- robot welding
- anodising
Where this example applies
Programmes that run oem replacement most often specify this build for fleet maintenance. Related applications include boat trailers, export programmes, utility trailers, construction equipment, racing teams.
Checks before packing
- Dimensional report against the approved drawing.
- AQL 1.5 sampling on the finished lot.
- Finish inspection under agreed lighting.
- Carton drop test on the first lot of a new packing specification.
Questions buyers ask
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
How long does sampling take?
Samples leave the factory in 10 working days, and each revision round adds about 3 days once you have seen the first piece.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the ISO/TS 16949-compliant build instead of a fresh interpretation.
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 3000 pieces per line.
Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.



