63 Inch Titan Tire Specification Example for Racing Teams: Vented Design
63 Inch Titan Tire Specification Example for Racing Teams: Vented Design
This is a worked specification for 63 inch titan tire in a vented design programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.
The vented design version exists because the duty cycle on racing teams is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually inconsistent hardness between lots.

Example specification
| Item | 63 Inch Titan Tire |
|---|---|
| Application | Racing Teams |
| Version | Vented Design |
| Base material | High Density Foam |
| Controlled dimensions | 4 key dimensions, recorded per lot |
| Tolerance band | ±0.1 mm |
| Finish | painted |
| MOQ | 3,000 pieces per specification |
| Sampling | 14 working days, 3 days per revision |
| Compliance | IATF 16949 |
How the example is built up
- Start from the duty cycle, not from the catalogue photograph.
- Fix the base material in writing — High Density Foam, in this example.
- List the dimensions that are actually controlled and the tolerance on each.
- Name the finish and what it has to survive.
- State the inspection level and who pays when a lot fails.

Processes involved
- gravity casting
- cold forging
- robot welding
- ultrasonic cleaning
- rubber vulcanisation
- injection moulding
Where this example applies
Programmes that run vented design most often specify this build for racing teams. Related applications include workshop replacements, agricultural trailers, long-haul trucks, utility trailers, trailer axles.
Checks before packing
- Dimensional report against the approved drawing.
- AQL 2.5 sampling on the finished lot.
- Finish inspection under agreed lighting.
- Carton drop test on the first lot of a new packing specification.
Questions buyers ask
What testing is included?
Standard lots ship with dimensional and hardness reports. IATF 16949 documentation is issued with the shipment when your market requires it.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
How long does sampling take?
Samples leave the factory in 14 working days, and each revision round adds about 3 days once you have seen the first piece.
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 3000 pieces per line.
Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.



