Welcome to Auto, Motorcycle Parts & Accessories official website!

Cylinder Head Repair Specification Example for Assembly Programmes: Touring Version

Source:Trailer Tail Lights / Time:2026-09-18

Cylinder Head Repair Specification Example for Assembly Programmes: Touring Version

This is a worked specification for cylinder head repair in a touring version programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.

The touring version version exists because the duty cycle on assembly programmes is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually reorders that did not match the approved sample.

Cylinder Head Repair

Example specification

ItemCylinder Head Repair
ApplicationAssembly Programmes
VersionTouring Version
Base materialPVC Coated Fabric
Controlled dimensions5 key dimensions, recorded per lot
Tolerance band±0.1 mm
Finishpainted
MOQ2,000 pieces per specification
Sampling10 working days, 5 days per revision
ComplianceECE R90

How the example is built up

  1. Start from the duty cycle, not from the catalogue photograph.
  2. Fix the base material in writing — PVC Coated Fabric, in this example.
  3. List the dimensions that are actually controlled and the tolerance on each.
  4. Name the finish and what it has to survive.
  5. State the inspection level and who pays when a lot fails.

Cylinder Head Repair example

Processes involved

  • electroplating
  • surface grinding
  • robot welding
  • ultrasonic cleaning
  • injection moulding
  • cold forging

Where this example applies

Programmes that run touring version most often specify this build for assembly programmes. Related applications include passenger cars, delivery vans, three-wheelers, construction equipment, agricultural trailers.

Checks before packing

  • Dimensional report against the approved drawing.
  • AQL 1.5 sampling on the finished lot.
  • Finish inspection under agreed lighting.
  • Carton drop test on the first lot of a new packing specification.

Questions buyers ask

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

Can the specification be held on file?

Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the ECE R90-compliant build instead of a fresh interpretation.

What testing is included?

Standard lots ship with dimensional and hardness reports. ECE R90 documentation is issued with the shipment when your market requires it.

What is the minimum order quantity?

The standard MOQ is 2000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.

Ask for the current catalogue and the specification sheet for this line.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top