Welcome to Auto, Motorcycle Parts & Accessories official website!

Motorbike Chain Lock Specification Example for Assembly Programmes: Quick Fit Version

Source:Motorcycle Tail Light / Time:2026-09-18

Motorbike Chain Lock Specification Example for Assembly Programmes: Quick Fit Version

This is a worked specification for motorbike chain lock in a quick fit version programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.

The quick fit version version exists because the duty cycle on assembly programmes is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually warranty claims traced back to a single lot.

Motorbike Chain Lock

Example specification

ItemMotorbike Chain Lock
ApplicationAssembly Programmes
VersionQuick Fit Version
Base materialStainless Steel
Controlled dimensions3 key dimensions, recorded per lot
Tolerance band±0.05 mm
Finishanodised
MOQ200 pieces per specification
Sampling7 working days, 3 days per revision
ComplianceISO 9001

How the example is built up

  1. Start from the duty cycle, not from the catalogue photograph.
  2. Fix the base material in writing — Stainless Steel, in this example.
  3. List the dimensions that are actually controlled and the tolerance on each.
  4. Name the finish and what it has to survive.
  5. State the inspection level and who pays when a lot fails.

Motorbike Chain Lock example

Processes involved

  • surface grinding
  • precision stamping
  • gravity casting
  • rubber vulcanisation
  • shot blasting
  • sintering

Where this example applies

Programmes that run quick fit version most often specify this build for assembly programmes. Related applications include rental motorcycles, aftermarket retail, workshop replacements, emergency vehicles, camper conversions.

Checks before packing

  • Dimensional report against the approved drawing.
  • AQL 2.5 sampling on the finished lot.
  • Finish inspection under agreed lighting.
  • Carton drop test on the first lot of a new packing specification.

Questions buyers ask

How long does sampling take?

Samples leave the factory in 7 working days, and each revision round adds about 3 days once you have seen the first piece.

What is the minimum order quantity?

The standard MOQ is 200 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

Can the specification be held on file?

Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the ISO 9001-compliant build instead of a fresh interpretation.

Share a sample or a drawing and we will quote against a written specification, not against a photograph.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top