Welcome to Auto, Motorcycle Parts & Accessories official website!

Car Rear Lamps Specification Example for Three-Wheelers: Off-Road Version

Source:Leather Steering Wheel Grip / Time:2026-09-18

Car Rear Lamps Specification Example for Three-Wheelers: Off-Road Version

This is a worked specification for car rear lamps in a off-road version programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.

The off-road version version exists because the duty cycle on three-wheelers is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually a fitment that looked right on paper and failed on the bench.

Car Rear Lamps

Example specification

ItemCar Rear Lamps
ApplicationThree-Wheelers
VersionOff-Road Version
Base materialAluminium Alloy
Controlled dimensions4 key dimensions, recorded per lot
Tolerance band±0.5 mm
Finishpowder coated
MOQ500 pieces per specification
Sampling14 working days, 5 days per revision
ComplianceCCC

How the example is built up

  1. Start from the duty cycle, not from the catalogue photograph.
  2. Fix the base material in writing — Aluminium Alloy, in this example.
  3. List the dimensions that are actually controlled and the tolerance on each.
  4. Name the finish and what it has to survive.
  5. State the inspection level and who pays when a lot fails.

Car Rear Lamps example

Processes involved

  • CNC machining
  • robot welding
  • electroplating
  • laser cutting
  • heat treatment
  • shot blasting

Where this example applies

Programmes that run off-road version most often specify this build for three-wheelers. Related applications include rental motorcycles, courier fleets, off-road bikes, trailer axles, export programmes.

Checks before packing

  • Dimensional report against the approved drawing.
  • AQL 4.0 sampling on the finished lot.
  • Finish inspection under agreed lighting.
  • Carton drop test on the first lot of a new packing specification.

Questions buyers ask

Can the specification be held on file?

Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the CCC-compliant build instead of a fresh interpretation.

How long does sampling take?

Samples leave the factory in 14 working days, and each revision round adds about 5 days once you have seen the first piece.

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

What testing is included?

Standard lots ship with dimensional and hardness reports. CCC documentation is issued with the shipment when your market requires it.

Send the specification you are working to and we will confirm what we can match, what we would change and why.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top