Welcome to Auto, Motorcycle Parts & Accessories official website!

Fuel Auto Filter Specification Example for Racing Teams: Load Rated Version

Source:Engine Piston Ring Set / Time:2026-09-18

Fuel Auto Filter Specification Example for Racing Teams: Load Rated Version

This is a worked specification for fuel auto filter in a load rated version programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.

The load rated version version exists because the duty cycle on racing teams is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually documentation that arrived after the container shipped.

Fuel Auto Filter

Example specification

ItemFuel Auto Filter
ApplicationRacing Teams
VersionLoad Rated Version
Base materialCarbon Fibre Composite
Controlled dimensions5 key dimensions, recorded per lot
Tolerance band±0.05 mm
Finishpowder coated
MOQ500 pieces per specification
Sampling10 working days, 5 days per revision
ComplianceRoHS

How the example is built up

  1. Start from the duty cycle, not from the catalogue photograph.
  2. Fix the base material in writing — Carbon Fibre Composite, in this example.
  3. List the dimensions that are actually controlled and the tolerance on each.
  4. Name the finish and what it has to survive.
  5. State the inspection level and who pays when a lot fails.

Fuel Auto Filter example

Processes involved

  • robot welding
  • CNC machining
  • anodising
  • die casting
  • sintering
  • rubber vulcanisation

Where this example applies

Programmes that run load rated version most often specify this build for racing teams. Related applications include utility trailers, three-wheelers, construction equipment, export programmes, racing teams.

Checks before packing

  • Dimensional report against the approved drawing.
  • AQL 1.5 sampling on the finished lot.
  • Finish inspection under agreed lighting.
  • Carton drop test on the first lot of a new packing specification.

Questions buyers ask

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

Do you handle mixed containers?

Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 500 pieces per line.

Can the specification be held on file?

Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the RoHS-compliant build instead of a fresh interpretation.

How long does sampling take?

Samples leave the factory in 10 working days, and each revision round adds about 5 days once you have seen the first piece.

Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top