MagneRide Suspension Specification Example for Boat Trailers: Fixed Type
MagneRide Suspension Specification Example for Boat Trailers: Fixed Type
This is a worked specification for magneride suspension in a fixed type programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.
The fixed type version exists because the duty cycle on boat trailers is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually documentation that arrived after the container shipped.

Example specification
| Item | MagneRide Suspension |
|---|---|
| Application | Boat Trailers |
| Version | Fixed Type |
| Base material | Powder Coated Steel |
| Controlled dimensions | 3 key dimensions, recorded per lot |
| Tolerance band | ±0.2 mm |
| Finish | zinc plated |
| MOQ | 3,000 pieces per specification |
| Sampling | 10 working days, 3 days per revision |
| Compliance | RoHS |
How the example is built up
- Start from the duty cycle, not from the catalogue photograph.
- Fix the base material in writing — Powder Coated Steel, in this example.
- List the dimensions that are actually controlled and the tolerance on each.
- Name the finish and what it has to survive.
- State the inspection level and who pays when a lot fails.

Processes involved
- assembly line testing
- sintering
- gravity casting
- rubber vulcanisation
- heat treatment
- anodising
Where this example applies
Programmes that run fixed type most often specify this build for boat trailers. Related applications include off-road bikes, passenger cars, rental motorcycles, trailer axles, fleet maintenance.
Checks before packing
- Dimensional report against the approved drawing.
- AQL 2.5 sampling on the finished lot.
- Finish inspection under agreed lighting.
- Carton drop test on the first lot of a new packing specification.
Questions buyers ask
How long does sampling take?
Samples leave the factory in 10 working days, and each revision round adds about 3 days once you have seen the first piece.
What testing is included?
Standard lots ship with dimensional and hardness reports. RoHS documentation is issued with the shipment when your market requires it.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
What is the minimum order quantity?
The standard MOQ is 3000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.



