Steel Wheel Hub Specification Example for Assembly Programmes: Off-Road Version
Steel Wheel Hub Specification Example for Assembly Programmes: Off-Road Version
This is a worked specification for steel wheel hub in a off-road version programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.
The off-road version version exists because the duty cycle on assembly programmes is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually reorders that did not match the approved sample.

Example specification
| Item | Steel Wheel Hub |
|---|---|
| Application | Assembly Programmes |
| Version | Off-Road Version |
| Base material | ABS Plastic |
| Controlled dimensions | 4 key dimensions, recorded per lot |
| Tolerance band | ±0.2 mm |
| Finish | powder coated |
| MOQ | 3,000 pieces per specification |
| Sampling | 10 working days, 5 days per revision |
| Compliance | REACH |
How the example is built up
- Start from the duty cycle, not from the catalogue photograph.
- Fix the base material in writing — ABS Plastic, in this example.
- List the dimensions that are actually controlled and the tolerance on each.
- Name the finish and what it has to survive.
- State the inspection level and who pays when a lot fails.

Processes involved
- powder coating
- robot welding
- assembly line testing
- laser cutting
- rubber vulcanisation
- electroplating
Where this example applies
Programmes that run off-road version most often specify this build for assembly programmes. Related applications include three-wheelers, utility trailers, trailer axles, delivery vans, municipal fleets.
Checks before packing
- Dimensional report against the approved drawing.
- AQL 4.0 sampling on the finished lot.
- Finish inspection under agreed lighting.
- Carton drop test on the first lot of a new packing specification.
Questions buyers ask
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 3000 pieces per line.
How long does sampling take?
Samples leave the factory in 10 working days, and each revision round adds about 5 days once you have seen the first piece.
What testing is included?
Standard lots ship with dimensional and hardness reports. REACH documentation is issued with the shipment when your market requires it.
Ask for the current catalogue and the specification sheet for this line.



