Steering Damper Specification Example for Fleet Maintenance: Drilled and Slotted
Steering Damper Specification Example for Fleet Maintenance: Drilled and Slotted
This is a worked specification for steering damper in a drilled and slotted programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.
The drilled and slotted version exists because the duty cycle on fleet maintenance is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually reorders that did not match the approved sample.

Example specification
| Item | Steering Damper |
|---|---|
| Application | Fleet Maintenance |
| Version | Drilled and Slotted |
| Base material | Natural Rubber |
| Controlled dimensions | 6 key dimensions, recorded per lot |
| Tolerance band | ±0.5 mm |
| Finish | anodised |
| MOQ | 200 pieces per specification |
| Sampling | 10 working days, 3 days per revision |
| Compliance | SGS |
How the example is built up
- Start from the duty cycle, not from the catalogue photograph.
- Fix the base material in writing — Natural Rubber, in this example.
- List the dimensions that are actually controlled and the tolerance on each.
- Name the finish and what it has to survive.
- State the inspection level and who pays when a lot fails.

Processes involved
- ultrasonic cleaning
- gravity casting
- anodising
- injection moulding
- laser cutting
- surface grinding
Where this example applies
Programmes that run drilled and slotted most often specify this build for fleet maintenance. Related applications include three-wheelers, workshop replacements, delivery vans, construction equipment, municipal fleets.
Checks before packing
- Dimensional report against the approved drawing.
- AQL 2.5 sampling on the finished lot.
- Finish inspection under agreed lighting.
- Carton drop test on the first lot of a new packing specification.
Questions buyers ask
What is the minimum order quantity?
The standard MOQ is 200 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
What testing is included?
Standard lots ship with dimensional and hardness reports. SGS documentation is issued with the shipment when your market requires it.
How long does sampling take?
Samples leave the factory in 10 working days, and each revision round adds about 3 days once you have seen the first piece.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the SGS-compliant build instead of a fresh interpretation.
Tell us the model, the fitment and the quantity and we will hold a production slot for you.



