Welcome to Auto, Motorcycle Parts & Accessories official website!

Off-Road LED Bar Specification Example for Municipal Fleets: Drilled and Slotted

Source:Electric Vehicle Winch / Time:2026-09-18

Off-Road LED Bar Specification Example for Municipal Fleets: Drilled and Slotted

This is a worked specification for off-road led bar in a drilled and slotted programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.

The drilled and slotted version exists because the duty cycle on municipal fleets is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually packing that arrived crushed at the port.

Off-Road LED Bar

Example specification

ItemOff-Road LED Bar
ApplicationMunicipal Fleets
VersionDrilled and Slotted
Base materialCarbon Steel
Controlled dimensions5 key dimensions, recorded per lot
Tolerance band±0.1 mm
Finishpowder coated
MOQ3,000 pieces per specification
Sampling10 working days, 3 days per revision
ComplianceDOT

How the example is built up

  1. Start from the duty cycle, not from the catalogue photograph.
  2. Fix the base material in writing — Carbon Steel, in this example.
  3. List the dimensions that are actually controlled and the tolerance on each.
  4. Name the finish and what it has to survive.
  5. State the inspection level and who pays when a lot fails.

Off-Road LED Bar example

Processes involved

  • anodising
  • injection moulding
  • cold forging
  • sintering
  • surface grinding
  • CNC machining

Where this example applies

Programmes that run drilled and slotted most often specify this build for municipal fleets. Related applications include construction equipment, city buses, long-haul trucks, delivery vans, light trucks.

Checks before packing

  • Dimensional report against the approved drawing.
  • AQL 1.5 sampling on the finished lot.
  • Finish inspection under agreed lighting.
  • Carton drop test on the first lot of a new packing specification.

Questions buyers ask

How long does sampling take?

Samples leave the factory in 10 working days, and each revision round adds about 3 days once you have seen the first piece.

Can you match an existing sample?

Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.

How is packing specified?

Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.

Do you handle mixed containers?

Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 3000 pieces per line.

Tell us the model, the fitment and the quantity and we will hold a production slot for you.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top