Welcome to Auto, Motorcycle Parts & Accessories official website!

CV Joint Drive Shaft Specification Example for Long-Haul Trucks: Folding Type

Source:Air Shock Absorber / Time:2026-09-18

CV Joint Drive Shaft Specification Example for Long-Haul Trucks: Folding Type

This is a worked specification for cv joint drive shaft in a folding type programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.

The folding type version exists because the duty cycle on long-haul trucks is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually packing that arrived crushed at the port.

CV Joint Drive Shaft

Example specification

ItemCV Joint Drive Shaft
ApplicationLong-Haul Trucks
VersionFolding Type
Base materialCeramic Composite
Controlled dimensions5 key dimensions, recorded per lot
Tolerance band±0.5 mm
Finishzinc plated
MOQ200 pieces per specification
Sampling7 working days, 5 days per revision
ComplianceSGS

How the example is built up

  1. Start from the duty cycle, not from the catalogue photograph.
  2. Fix the base material in writing — Ceramic Composite, in this example.
  3. List the dimensions that are actually controlled and the tolerance on each.
  4. Name the finish and what it has to survive.
  5. State the inspection level and who pays when a lot fails.

CV Joint Drive Shaft example

Processes involved

  • injection moulding
  • die casting
  • anodising
  • shot blasting
  • laser cutting
  • heat treatment

Where this example applies

Programmes that run folding type most often specify this build for long-haul trucks. Related applications include camper conversions, off-road bikes, aftermarket retail, rental motorcycles, construction equipment.

Checks before packing

  • Dimensional report against the approved drawing.
  • AQL 2.5 sampling on the finished lot.
  • Finish inspection under agreed lighting.
  • Carton drop test on the first lot of a new packing specification.

Questions buyers ask

Can the specification be held on file?

Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the SGS-compliant build instead of a fresh interpretation.

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

How long does sampling take?

Samples leave the factory in 7 working days, and each revision round adds about 5 days once you have seen the first piece.

Can you match an existing sample?

Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.

Share a sample or a drawing and we will quote against a written specification, not against a photograph.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top