Welcome to Auto, Motorcycle Parts & Accessories official website!

Steel Wheel Hub Specification Example for Workshop Replacements: Vented Design

Source:Lithium Ion Car Battery / Time:2026-09-18

Steel Wheel Hub Specification Example for Workshop Replacements: Vented Design

This is a worked specification for steel wheel hub in a vented design programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.

The vented design version exists because the duty cycle on workshop replacements is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually documentation that arrived after the container shipped.

Steel Wheel Hub

Example specification

ItemSteel Wheel Hub
ApplicationWorkshop Replacements
VersionVented Design
Base materialBronze
Controlled dimensions3 key dimensions, recorded per lot
Tolerance band±0.1 mm
Finishzinc plated
MOQ200 pieces per specification
Sampling10 working days, 5 days per revision
ComplianceDOT

How the example is built up

  1. Start from the duty cycle, not from the catalogue photograph.
  2. Fix the base material in writing — Bronze, in this example.
  3. List the dimensions that are actually controlled and the tolerance on each.
  4. Name the finish and what it has to survive.
  5. State the inspection level and who pays when a lot fails.

Steel Wheel Hub example

Processes involved

  • gravity casting
  • rubber vulcanisation
  • ultrasonic cleaning
  • CNC machining
  • robot welding
  • precision stamping

Where this example applies

Programmes that run vented design most often specify this build for workshop replacements. Related applications include light trucks, three-wheelers, rental motorcycles, export programmes, assembly programmes.

Checks before packing

  • Dimensional report against the approved drawing.
  • AQL 4.0 sampling on the finished lot.
  • Finish inspection under agreed lighting.
  • Carton drop test on the first lot of a new packing specification.

Questions buyers ask

How is packing specified?

Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.

Can the specification be held on file?

Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the DOT-compliant build instead of a fresh interpretation.

What testing is included?

Standard lots ship with dimensional and hardness reports. DOT documentation is issued with the shipment when your market requires it.

How long does sampling take?

Samples leave the factory in 10 working days, and each revision round adds about 5 days once you have seen the first piece.

Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top