This is a worked specification for engine starter system in a vented design programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.

The vented design version exists because the duty cycle on long-haul trucks is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually warranty claims traced back to a single lot.

Engine Starter System

Example specification

ItemEngine Starter System
ApplicationLong-Haul Trucks
VersionVented Design
Base materialSintered Metal
Controlled dimensions4 key dimensions, recorded per lot
Tolerance band±0.05 mm
Finishzinc plated
MOQ3,000 pieces per specification
Sampling14 working days, 3 days per revision
ComplianceDOT

How the example is built up

  1. Start from the duty cycle, not from the catalogue photograph.
  2. Fix the base material in writing — Sintered Metal, in this example.
  3. List the dimensions that are actually controlled and the tolerance on each.
  4. Name the finish and what it has to survive.
  5. State the inspection level and who pays when a lot fails.

Engine Starter System example

Processes involved

  • laser cutting
  • die casting
  • anodising
  • shot blasting
  • heat treatment
  • assembly line testing

Where this example applies

Programmes that run vented design most often specify this build for long-haul trucks. Related applications include emergency vehicles, utility trailers, racing teams, boat trailers, city buses.

Checks before packing

  • Dimensional report against the approved drawing.
  • AQL 2.5 sampling on the finished lot.
  • Finish inspection under agreed lighting.
  • Carton drop test on the first lot of a new packing specification.

Questions buyers ask

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

Can you match an existing sample?

Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.

What is the minimum order quantity?

The standard MOQ is 3000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.

Can the specification be held on file?

Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the DOT-compliant build instead of a fresh interpretation.

Send the specification you are working to and we will confirm what we can match, what we would change and why.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top