Welcome to Auto, Motorcycle Parts & Accessories official website!

Car Sun Rain Guard Specification Example for Assembly Programmes: Two-Piece Construction

Source:Air Auto Filter / Time:2026-09-18

Car Sun Rain Guard Specification Example for Assembly Programmes: Two-Piece Construction

This is a worked specification for car sun rain guard in a two-piece construction programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.

The two-piece construction version exists because the duty cycle on assembly programmes is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually premature wear on the first batch.

Car Sun Rain Guard

Example specification

ItemCar Sun Rain Guard
ApplicationAssembly Programmes
VersionTwo-Piece Construction
Base materialCarbon Fibre Composite
Controlled dimensions4 key dimensions, recorded per lot
Tolerance band±0.2 mm
Finishzinc plated
MOQ200 pieces per specification
Sampling14 working days, 5 days per revision
ComplianceREACH

How the example is built up

  1. Start from the duty cycle, not from the catalogue photograph.
  2. Fix the base material in writing — Carbon Fibre Composite, in this example.
  3. List the dimensions that are actually controlled and the tolerance on each.
  4. Name the finish and what it has to survive.
  5. State the inspection level and who pays when a lot fails.

Car Sun Rain Guard example

Processes involved

  • heat treatment
  • cold forging
  • anodising
  • die casting
  • shot blasting
  • CNC machining

Where this example applies

Programmes that run two-piece construction most often specify this build for assembly programmes. Related applications include boat trailers, camper conversions, racing teams, workshop replacements, construction equipment.

Checks before packing

  • Dimensional report against the approved drawing.
  • AQL 4.0 sampling on the finished lot.
  • Finish inspection under agreed lighting.
  • Carton drop test on the first lot of a new packing specification.

Questions buyers ask

Do you handle mixed containers?

Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 200 pieces per line.

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

How is packing specified?

Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.

What is the minimum order quantity?

The standard MOQ is 200 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.

Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top