Welcome to Auto, Motorcycle Parts & Accessories official website!

Engine Starter System Specification Example for Off-Road Bikes: Low Maintenance Version

Source:Pneumatic Brake / Time:2026-09-18

Engine Starter System Specification Example for Off-Road Bikes: Low Maintenance Version

This is a worked specification for engine starter system in a low maintenance version programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.

The low maintenance version version exists because the duty cycle on off-road bikes is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually documentation that arrived after the container shipped.

Engine Starter System

Example specification

ItemEngine Starter System
ApplicationOff-Road Bikes
VersionLow Maintenance Version
Base materialChromed Steel
Controlled dimensions3 key dimensions, recorded per lot
Tolerance band±0.05 mm
Finishpowder coated
MOQ3,000 pieces per specification
Sampling14 working days, 3 days per revision
ComplianceRoHS

How the example is built up

  1. Start from the duty cycle, not from the catalogue photograph.
  2. Fix the base material in writing — Chromed Steel, in this example.
  3. List the dimensions that are actually controlled and the tolerance on each.
  4. Name the finish and what it has to survive.
  5. State the inspection level and who pays when a lot fails.

Engine Starter System example

Processes involved

  • surface grinding
  • heat treatment
  • laser cutting
  • shot blasting
  • electroplating
  • gravity casting

Where this example applies

Programmes that run low maintenance version most often specify this build for off-road bikes. Related applications include racing teams, city buses, agricultural trailers, assembly programmes, rental motorcycles.

Checks before packing

  • Dimensional report against the approved drawing.
  • AQL 1.5 sampling on the finished lot.
  • Finish inspection under agreed lighting.
  • Carton drop test on the first lot of a new packing specification.

Questions buyers ask

What testing is included?

Standard lots ship with dimensional and hardness reports. RoHS documentation is issued with the shipment when your market requires it.

Can the specification be held on file?

Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the RoHS-compliant build instead of a fresh interpretation.

How is packing specified?

Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.

How long does sampling take?

Samples leave the factory in 14 working days, and each revision round adds about 3 days once you have seen the first piece.

Tell us the model, the fitment and the quantity and we will hold a production slot for you.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top