Welcome to Auto, Motorcycle Parts & Accessories official website!

Electric Car Motor Specification Example for Camper Conversions: Racing Spec

Source:Clip-On Mirror Replacement / Time:2026-09-18

Electric Car Motor Specification Example for Camper Conversions: Racing Spec

This is a worked specification for electric car motor in a racing spec programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.

The racing spec version exists because the duty cycle on camper conversions is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually documentation that arrived after the container shipped.

Electric Car Motor

Example specification

ItemElectric Car Motor
ApplicationCamper Conversions
VersionRacing Spec
Base materialPVC Coated Fabric
Controlled dimensions3 key dimensions, recorded per lot
Tolerance band±0.5 mm
Finishpowder coated
MOQ2,000 pieces per specification
Sampling10 working days, 5 days per revision
ComplianceE-mark

How the example is built up

  1. Start from the duty cycle, not from the catalogue photograph.
  2. Fix the base material in writing — PVC Coated Fabric, in this example.
  3. List the dimensions that are actually controlled and the tolerance on each.
  4. Name the finish and what it has to survive.
  5. State the inspection level and who pays when a lot fails.

Electric Car Motor example

Processes involved

  • laser cutting
  • sintering
  • gravity casting
  • electroplating
  • rubber vulcanisation
  • anodising

Where this example applies

Programmes that run racing spec most often specify this build for camper conversions. Related applications include three-wheelers, trailer axles, municipal fleets, racing teams, dealership service.

Checks before packing

  • Dimensional report against the approved drawing.
  • AQL 1.5 sampling on the finished lot.
  • Finish inspection under agreed lighting.
  • Carton drop test on the first lot of a new packing specification.

Questions buyers ask

What testing is included?

Standard lots ship with dimensional and hardness reports. E-mark documentation is issued with the shipment when your market requires it.

Do you handle mixed containers?

Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 2000 pieces per line.

How is packing specified?

Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

Share a sample or a drawing and we will quote against a written specification, not against a photograph.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top