Welcome to Auto, Motorcycle Parts & Accessories official website!

Fuel Storage System Specification Example for Export Programmes: Two-Piece Construction

Source:Automotive Door Panel / Time:2026-09-18

Fuel Storage System Specification Example for Export Programmes: Two-Piece Construction

This is a worked specification for fuel storage system in a two-piece construction programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.

The two-piece construction version exists because the duty cycle on export programmes is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually inconsistent hardness between lots.

Fuel Storage System

Example specification

ItemFuel Storage System
ApplicationExport Programmes
VersionTwo-Piece Construction
Base materialReinforced Nylon
Controlled dimensions6 key dimensions, recorded per lot
Tolerance band±0.2 mm
Finishanodised
MOQ200 pieces per specification
Sampling10 working days, 3 days per revision
ComplianceCCC

How the example is built up

  1. Start from the duty cycle, not from the catalogue photograph.
  2. Fix the base material in writing — Reinforced Nylon, in this example.
  3. List the dimensions that are actually controlled and the tolerance on each.
  4. Name the finish and what it has to survive.
  5. State the inspection level and who pays when a lot fails.

Fuel Storage System example

Processes involved

  • anodising
  • die casting
  • assembly line testing
  • cold forging
  • shot blasting
  • surface grinding

Where this example applies

Programmes that run two-piece construction most often specify this build for export programmes. Related applications include off-road bikes, rental motorcycles, emergency vehicles, aftermarket retail, scooter fleets.

Checks before packing

  • Dimensional report against the approved drawing.
  • AQL 1.5 sampling on the finished lot.
  • Finish inspection under agreed lighting.
  • Carton drop test on the first lot of a new packing specification.

Questions buyers ask

What testing is included?

Standard lots ship with dimensional and hardness reports. CCC documentation is issued with the shipment when your market requires it.

Do you handle mixed containers?

Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 200 pieces per line.

How long does sampling take?

Samples leave the factory in 10 working days, and each revision round adds about 3 days once you have seen the first piece.

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

Share a sample or a drawing and we will quote against a written specification, not against a photograph.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top