Welcome to Auto, Motorcycle Parts & Accessories official website!

MagneRide Suspension Specification Example for Workshop Replacements: Touring Version

Source:Aftermarket Engine Brackets / Time:2026-09-18

MagneRide Suspension Specification Example for Workshop Replacements: Touring Version

This is a worked specification for magneride suspension in a touring version programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.

The touring version version exists because the duty cycle on workshop replacements is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually packing that arrived crushed at the port.

MagneRide Suspension

Example specification

ItemMagneRide Suspension
ApplicationWorkshop Replacements
VersionTouring Version
Base materialKevlar Composite
Controlled dimensions4 key dimensions, recorded per lot
Tolerance band±0.1 mm
Finishpainted
MOQ200 pieces per specification
Sampling7 working days, 3 days per revision
ComplianceECE R90

How the example is built up

  1. Start from the duty cycle, not from the catalogue photograph.
  2. Fix the base material in writing — Kevlar Composite, in this example.
  3. List the dimensions that are actually controlled and the tolerance on each.
  4. Name the finish and what it has to survive.
  5. State the inspection level and who pays when a lot fails.

MagneRide Suspension example

Processes involved

  • electroplating
  • die casting
  • powder coating
  • robot welding
  • rubber vulcanisation
  • heat treatment

Where this example applies

Programmes that run touring version most often specify this build for workshop replacements. Related applications include off-road bikes, aftermarket retail, workshop replacements, camper conversions, construction equipment.

Checks before packing

  • Dimensional report against the approved drawing.
  • AQL 1.5 sampling on the finished lot.
  • Finish inspection under agreed lighting.
  • Carton drop test on the first lot of a new packing specification.

Questions buyers ask

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

How is packing specified?

Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.

How long does sampling take?

Samples leave the factory in 7 working days, and each revision round adds about 3 days once you have seen the first piece.

Can the specification be held on file?

Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the ECE R90-compliant build instead of a fresh interpretation.

Share a sample or a drawing and we will quote against a written specification, not against a photograph.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top