Welcome to Auto, Motorcycle Parts & Accessories official website!

Vehicle Speedometer Tachometer Specification Example for Racing Teams: Long Life Version

Source:Vehicle Scent Diffuser / Time:2026-09-18

Vehicle Speedometer Tachometer Specification Example for Racing Teams: Long Life Version

This is a worked specification for vehicle speedometer tachometer in a long life version programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.

The long life version version exists because the duty cycle on racing teams is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually lead time that slipped twice before bulk started.

Vehicle Speedometer Tachometer

Example specification

ItemVehicle Speedometer Tachometer
ApplicationRacing Teams
VersionLong Life Version
Base materialTempered Glass
Controlled dimensions5 key dimensions, recorded per lot
Tolerance band±0.1 mm
Finishpainted
MOQ200 pieces per specification
Sampling10 working days, 3 days per revision
ComplianceSGS

How the example is built up

  1. Start from the duty cycle, not from the catalogue photograph.
  2. Fix the base material in writing — Tempered Glass, in this example.
  3. List the dimensions that are actually controlled and the tolerance on each.
  4. Name the finish and what it has to survive.
  5. State the inspection level and who pays when a lot fails.

Vehicle Speedometer Tachometer example

Processes involved

  • die casting
  • injection moulding
  • cold forging
  • robot welding
  • surface grinding
  • assembly line testing

Where this example applies

Programmes that run long life version most often specify this build for racing teams. Related applications include construction equipment, light trucks, rental motorcycles, aftermarket retail, off-road bikes.

Checks before packing

  • Dimensional report against the approved drawing.
  • AQL 4.0 sampling on the finished lot.
  • Finish inspection under agreed lighting.
  • Carton drop test on the first lot of a new packing specification.

Questions buyers ask

Can the specification be held on file?

Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the SGS-compliant build instead of a fresh interpretation.

How long does sampling take?

Samples leave the factory in 10 working days, and each revision round adds about 3 days once you have seen the first piece.

Do you handle mixed containers?

Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 200 pieces per line.

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

Send the specification you are working to and we will confirm what we can match, what we would change and why.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top