Welcome to Auto, Motorcycle Parts & Accessories official website!

Engine Oil Sump Specification Example for Utility Trailers: Racing Spec

Source:Performance Flywheel / Time:2026-09-18

Engine Oil Sump Specification Example for Utility Trailers: Racing Spec

This is a worked specification for engine oil sump in a racing spec programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.

The racing spec version exists because the duty cycle on utility trailers is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually warranty claims traced back to a single lot.

Engine Oil Sump

Example specification

ItemEngine Oil Sump
ApplicationUtility Trailers
VersionRacing Spec
Base materialPU Leather
Controlled dimensions4 key dimensions, recorded per lot
Tolerance band±0.5 mm
Finishanodised
MOQ500 pieces per specification
Sampling7 working days, 5 days per revision
ComplianceECE R90

How the example is built up

  1. Start from the duty cycle, not from the catalogue photograph.
  2. Fix the base material in writing — PU Leather, in this example.
  3. List the dimensions that are actually controlled and the tolerance on each.
  4. Name the finish and what it has to survive.
  5. State the inspection level and who pays when a lot fails.

Engine Oil Sump example

Processes involved

  • electroplating
  • sintering
  • gravity casting
  • die casting
  • laser cutting
  • precision stamping

Where this example applies

Programmes that run racing spec most often specify this build for utility trailers. Related applications include off-road bikes, agricultural trailers, dealership service, rental motorcycles, aftermarket retail.

Checks before packing

  • Dimensional report against the approved drawing.
  • AQL 2.5 sampling on the finished lot.
  • Finish inspection under agreed lighting.
  • Carton drop test on the first lot of a new packing specification.

Questions buyers ask

Do you handle mixed containers?

Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 500 pieces per line.

How is packing specified?

Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.

How long does sampling take?

Samples leave the factory in 7 working days, and each revision round adds about 5 days once you have seen the first piece.

Can you match an existing sample?

Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.

Ask for the current catalogue and the specification sheet for this line.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top