Welcome to Auto, Motorcycle Parts & Accessories official website!

12V Electric Car Fridge Specification Example for Workshop Replacements: Two-Piece Construction

Source:Industrial Timing Pulley / Time:2026-09-18

12V Electric Car Fridge Specification Example for Workshop Replacements: Two-Piece Construction

This is a worked specification for 12v electric car fridge in a two-piece construction programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.

The two-piece construction version exists because the duty cycle on workshop replacements is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually inconsistent hardness between lots.

12V Electric Car Fridge

Example specification

Item12V Electric Car Fridge
ApplicationWorkshop Replacements
VersionTwo-Piece Construction
Base materialCarbon Fibre Composite
Controlled dimensions4 key dimensions, recorded per lot
Tolerance band±0.05 mm
Finishpainted
MOQ200 pieces per specification
Sampling10 working days, 5 days per revision
ComplianceSAE J431

How the example is built up

  1. Start from the duty cycle, not from the catalogue photograph.
  2. Fix the base material in writing — Carbon Fibre Composite, in this example.
  3. List the dimensions that are actually controlled and the tolerance on each.
  4. Name the finish and what it has to survive.
  5. State the inspection level and who pays when a lot fails.

12V Electric Car Fridge example

Processes involved

  • rubber vulcanisation
  • anodising
  • ultrasonic cleaning
  • injection moulding
  • electroplating
  • cold forging

Where this example applies

Programmes that run two-piece construction most often specify this build for workshop replacements. Related applications include camper conversions, off-road bikes, delivery vans, utility trailers, agricultural trailers.

Checks before packing

  • Dimensional report against the approved drawing.
  • AQL 1.5 sampling on the finished lot.
  • Finish inspection under agreed lighting.
  • Carton drop test on the first lot of a new packing specification.

Questions buyers ask

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

Can the specification be held on file?

Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the SAE J431-compliant build instead of a fresh interpretation.

What testing is included?

Standard lots ship with dimensional and hardness reports. SAE J431 documentation is issued with the shipment when your market requires it.

Can you match an existing sample?

Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.

Send the specification you are working to and we will confirm what we can match, what we would change and why.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top