Welcome to Auto, Motorcycle Parts & Accessories official website!

Vehicle Fault Code Reader Specification Example for Rental Motorcycles: Long Life Version

Source:Car Purse Holder / Time:2026-09-18

Vehicle Fault Code Reader Specification Example for Rental Motorcycles: Long Life Version

This is a worked specification for vehicle fault code reader in a long life version programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.

The long life version version exists because the duty cycle on rental motorcycles is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually a specification nobody had written down.

Vehicle Fault Code Reader

Example specification

ItemVehicle Fault Code Reader
ApplicationRental Motorcycles
VersionLong Life Version
Base materialBronze
Controlled dimensions4 key dimensions, recorded per lot
Tolerance band±0.1 mm
Finishas machined
MOQ200 pieces per specification
Sampling10 working days, 5 days per revision
ComplianceISO 9001

How the example is built up

  1. Start from the duty cycle, not from the catalogue photograph.
  2. Fix the base material in writing — Bronze, in this example.
  3. List the dimensions that are actually controlled and the tolerance on each.
  4. Name the finish and what it has to survive.
  5. State the inspection level and who pays when a lot fails.

Vehicle Fault Code Reader example

Processes involved

  • anodising
  • cold forging
  • robot welding
  • die casting
  • CNC machining
  • gravity casting

Where this example applies

Programmes that run long life version most often specify this build for rental motorcycles. Related applications include scooter fleets, utility trailers, aftermarket retail, dealership service, construction equipment.

Checks before packing

  • Dimensional report against the approved drawing.
  • AQL 2.5 sampling on the finished lot.
  • Finish inspection under agreed lighting.
  • Carton drop test on the first lot of a new packing specification.

Questions buyers ask

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

Do you handle mixed containers?

Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 200 pieces per line.

Can the specification be held on file?

Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the ISO 9001-compliant build instead of a fresh interpretation.

How long does sampling take?

Samples leave the factory in 10 working days, and each revision round adds about 5 days once you have seen the first piece.

Ask for the current catalogue and the specification sheet for this line.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top