Welcome to Auto, Motorcycle Parts & Accessories official website!

Engine Starter System Specification Example for Utility Trailers: Load Rated Version

Source:CNG Engine For Vehicles / Time:2026-09-18

Engine Starter System Specification Example for Utility Trailers: Load Rated Version

This is a worked specification for engine starter system in a load rated version programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.

The load rated version version exists because the duty cycle on utility trailers is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually lead time that slipped twice before bulk started.

Engine Starter System

Example specification

ItemEngine Starter System
ApplicationUtility Trailers
VersionLoad Rated Version
Base materialSilicone
Controlled dimensions4 key dimensions, recorded per lot
Tolerance band±0.5 mm
Finishanodised
MOQ2,000 pieces per specification
Sampling10 working days, 5 days per revision
ComplianceECE R90

How the example is built up

  1. Start from the duty cycle, not from the catalogue photograph.
  2. Fix the base material in writing — Silicone, in this example.
  3. List the dimensions that are actually controlled and the tolerance on each.
  4. Name the finish and what it has to survive.
  5. State the inspection level and who pays when a lot fails.

Engine Starter System example

Processes involved

  • electroplating
  • sintering
  • injection moulding
  • die casting
  • anodising
  • shot blasting

Where this example applies

Programmes that run load rated version most often specify this build for utility trailers. Related applications include assembly programmes, export programmes, long-haul trucks, light trucks, delivery vans.

Checks before packing

  • Dimensional report against the approved drawing.
  • AQL 2.5 sampling on the finished lot.
  • Finish inspection under agreed lighting.
  • Carton drop test on the first lot of a new packing specification.

Questions buyers ask

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

What is the minimum order quantity?

The standard MOQ is 2000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.

What testing is included?

Standard lots ship with dimensional and hardness reports. ECE R90 documentation is issued with the shipment when your market requires it.

How is packing specified?

Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.

Send the specification you are working to and we will confirm what we can match, what we would change and why.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top