Steering Damper Specification Example for Fleet Maintenance: Lightweight Version
Steering Damper Specification Example for Fleet Maintenance: Lightweight Version
This is a worked specification for steering damper in a lightweight version programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.
The lightweight version version exists because the duty cycle on fleet maintenance is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually warranty claims traced back to a single lot.

Example specification
| Item | Steering Damper |
|---|---|
| Application | Fleet Maintenance |
| Version | Lightweight Version |
| Base material | Forged Aluminium |
| Controlled dimensions | 3 key dimensions, recorded per lot |
| Tolerance band | ±0.05 mm |
| Finish | as machined |
| MOQ | 500 pieces per specification |
| Sampling | 10 working days, 3 days per revision |
| Compliance | SAE J431 |
How the example is built up
- Start from the duty cycle, not from the catalogue photograph.
- Fix the base material in writing — Forged Aluminium, in this example.
- List the dimensions that are actually controlled and the tolerance on each.
- Name the finish and what it has to survive.
- State the inspection level and who pays when a lot fails.

Processes involved
- rubber vulcanisation
- cold forging
- shot blasting
- die casting
- heat treatment
- electroplating
Where this example applies
Programmes that run lightweight version most often specify this build for fleet maintenance. Related applications include rental motorcycles, racing teams, assembly programmes, emergency vehicles, long-haul trucks.
Checks before packing
- Dimensional report against the approved drawing.
- AQL 4.0 sampling on the finished lot.
- Finish inspection under agreed lighting.
- Carton drop test on the first lot of a new packing specification.
Questions buyers ask
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
What is the minimum order quantity?
The standard MOQ is 500 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
How long does sampling take?
Samples leave the factory in 10 working days, and each revision round adds about 3 days once you have seen the first piece.
What testing is included?
Standard lots ship with dimensional and hardness reports. SAE J431 documentation is issued with the shipment when your market requires it.
Tell us the model, the fitment and the quantity and we will hold a production slot for you.



