Electric Boat Engine Specification Example for Three-Wheelers: Load Rated Version
Electric Boat Engine Specification Example for Three-Wheelers: Load Rated Version
This is a worked specification for electric boat engine in a load rated version programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.
The load rated version version exists because the duty cycle on three-wheelers is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually inconsistent hardness between lots.

Example specification
| Item | Electric Boat Engine |
|---|---|
| Application | Three-Wheelers |
| Version | Load Rated Version |
| Base material | Anodised Aluminium |
| Controlled dimensions | 6 key dimensions, recorded per lot |
| Tolerance band | ±0.1 mm |
| Finish | as machined |
| MOQ | 1,000 pieces per specification |
| Sampling | 7 working days, 3 days per revision |
| Compliance | CCC |
How the example is built up
- Start from the duty cycle, not from the catalogue photograph.
- Fix the base material in writing — Anodised Aluminium, in this example.
- List the dimensions that are actually controlled and the tolerance on each.
- Name the finish and what it has to survive.
- State the inspection level and who pays when a lot fails.

Processes involved
- die casting
- electroplating
- robot welding
- anodising
- laser cutting
- cold forging
Where this example applies
Programmes that run load rated version most often specify this build for three-wheelers. Related applications include assembly programmes, camper conversions, municipal fleets, light trucks, long-haul trucks.
Checks before packing
- Dimensional report against the approved drawing.
- AQL 1.5 sampling on the finished lot.
- Finish inspection under agreed lighting.
- Carton drop test on the first lot of a new packing specification.
Questions buyers ask
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
How long does sampling take?
Samples leave the factory in 7 working days, and each revision round adds about 3 days once you have seen the first piece.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.



