This is a worked specification for asymmetric tread pattern tire in a off-road version programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.

The off-road version version exists because the duty cycle on camper conversions is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually a specification nobody had written down.

Asymmetric Tread Pattern Tire

Example specification

ItemAsymmetric Tread Pattern Tire
ApplicationCamper Conversions
VersionOff-Road Version
Base materialAnodised Aluminium
Controlled dimensions6 key dimensions, recorded per lot
Tolerance band±0.1 mm
Finishpowder coated
MOQ500 pieces per specification
Sampling7 working days, 3 days per revision
ComplianceCCC

How the example is built up

  1. Start from the duty cycle, not from the catalogue photograph.
  2. Fix the base material in writing — Anodised Aluminium, in this example.
  3. List the dimensions that are actually controlled and the tolerance on each.
  4. Name the finish and what it has to survive.
  5. State the inspection level and who pays when a lot fails.

Asymmetric Tread Pattern Tire example

Processes involved

  • heat treatment
  • injection moulding
  • laser cutting
  • sintering
  • rubber vulcanisation
  • cold forging

Where this example applies

Programmes that run off-road version most often specify this build for camper conversions. Related applications include camper conversions, passenger cars, municipal fleets, rental motorcycles, trailer axles.

Checks before packing

  • Dimensional report against the approved drawing.
  • AQL 1.5 sampling on the finished lot.
  • Finish inspection under agreed lighting.
  • Carton drop test on the first lot of a new packing specification.

Questions buyers ask

How long does sampling take?

Samples leave the factory in 7 working days, and each revision round adds about 3 days once you have seen the first piece.

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

What is the minimum order quantity?

The standard MOQ is 500 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.

What testing is included?

Standard lots ship with dimensional and hardness reports. CCC documentation is issued with the shipment when your market requires it.

Tell us the model, the fitment and the quantity and we will hold a production slot for you.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top