Welcome to Auto, Motorcycle Parts & Accessories official website!

Electric Power Steering System Specification Example for Off-Road Bikes: Quick Fit Version

Source:Industrial Foot Controller / Time:2026-09-18

Electric Power Steering System Specification Example for Off-Road Bikes: Quick Fit Version

This is a worked specification for electric power steering system in a quick fit version programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.

The quick fit version version exists because the duty cycle on off-road bikes is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually warranty claims traced back to a single lot.

Electric Power Steering System

Example specification

ItemElectric Power Steering System
ApplicationOff-Road Bikes
VersionQuick Fit Version
Base materialHigh Density Foam
Controlled dimensions5 key dimensions, recorded per lot
Tolerance band±0.05 mm
Finishanodised
MOQ200 pieces per specification
Sampling14 working days, 5 days per revision
ComplianceREACH

How the example is built up

  1. Start from the duty cycle, not from the catalogue photograph.
  2. Fix the base material in writing — High Density Foam, in this example.
  3. List the dimensions that are actually controlled and the tolerance on each.
  4. Name the finish and what it has to survive.
  5. State the inspection level and who pays when a lot fails.

Electric Power Steering System example

Processes involved

  • sintering
  • ultrasonic cleaning
  • heat treatment
  • die casting
  • precision stamping
  • assembly line testing

Where this example applies

Programmes that run quick fit version most often specify this build for off-road bikes. Related applications include assembly programmes, dealership service, camper conversions, scooter fleets, construction equipment.

Checks before packing

  • Dimensional report against the approved drawing.
  • AQL 1.5 sampling on the finished lot.
  • Finish inspection under agreed lighting.
  • Carton drop test on the first lot of a new packing specification.

Questions buyers ask

Can the specification be held on file?

Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the REACH-compliant build instead of a fresh interpretation.

Can you match an existing sample?

Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.

What testing is included?

Standard lots ship with dimensional and hardness reports. REACH documentation is issued with the shipment when your market requires it.

Do you handle mixed containers?

Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 200 pieces per line.

Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top