Welcome to Auto, Motorcycle Parts & Accessories official website!

Transmission Fluid Pan Specification Example for Trailer Axles: Reinforced Build

Source:Reflective Car Shade / Time:2026-09-18

Transmission Fluid Pan Specification Example for Trailer Axles: Reinforced Build

This is a worked specification for transmission fluid pan in a reinforced build programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.

The reinforced build version exists because the duty cycle on trailer axles is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually packing that arrived crushed at the port.

Transmission Fluid Pan

Example specification

ItemTransmission Fluid Pan
ApplicationTrailer Axles
VersionReinforced Build
Base materialForged Aluminium
Controlled dimensions6 key dimensions, recorded per lot
Tolerance band±0.05 mm
Finishanodised
MOQ500 pieces per specification
Sampling14 working days, 3 days per revision
ComplianceECE R90

How the example is built up

  1. Start from the duty cycle, not from the catalogue photograph.
  2. Fix the base material in writing — Forged Aluminium, in this example.
  3. List the dimensions that are actually controlled and the tolerance on each.
  4. Name the finish and what it has to survive.
  5. State the inspection level and who pays when a lot fails.

Transmission Fluid Pan example

Processes involved

  • die casting
  • assembly line testing
  • electroplating
  • robot welding
  • powder coating
  • sintering

Where this example applies

Programmes that run reinforced build most often specify this build for trailer axles. Related applications include light trucks, camper conversions, workshop replacements, long-haul trucks, dealership service.

Checks before packing

  • Dimensional report against the approved drawing.
  • AQL 2.5 sampling on the finished lot.
  • Finish inspection under agreed lighting.
  • Carton drop test on the first lot of a new packing specification.

Questions buyers ask

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

Can you match an existing sample?

Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.

What testing is included?

Standard lots ship with dimensional and hardness reports. ECE R90 documentation is issued with the shipment when your market requires it.

How is packing specified?

Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.

Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top