Welcome to Auto, Motorcycle Parts & Accessories official website!

LED Headlight Specification Example for Utility Trailers: Racing Spec

Source:Mobile Phone Repair Tools / Time:2026-09-18

LED Headlight Specification Example for Utility Trailers: Racing Spec

This is a worked specification for led headlight in a racing spec programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.

The racing spec version exists because the duty cycle on utility trailers is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually lead time that slipped twice before bulk started.

LED Headlight

Example specification

ItemLED Headlight
ApplicationUtility Trailers
VersionRacing Spec
Base materialNatural Rubber
Controlled dimensions6 key dimensions, recorded per lot
Tolerance band±0.2 mm
Finishas machined
MOQ2,000 pieces per specification
Sampling7 working days, 3 days per revision
ComplianceSGS

How the example is built up

  1. Start from the duty cycle, not from the catalogue photograph.
  2. Fix the base material in writing — Natural Rubber, in this example.
  3. List the dimensions that are actually controlled and the tolerance on each.
  4. Name the finish and what it has to survive.
  5. State the inspection level and who pays when a lot fails.

LED Headlight example

Processes involved

  • die casting
  • ultrasonic cleaning
  • laser cutting
  • cold forging
  • shot blasting
  • robot welding

Where this example applies

Programmes that run racing spec most often specify this build for utility trailers. Related applications include city buses, dealership service, scooter fleets, off-road bikes, long-haul trucks.

Checks before packing

  • Dimensional report against the approved drawing.
  • AQL 2.5 sampling on the finished lot.
  • Finish inspection under agreed lighting.
  • Carton drop test on the first lot of a new packing specification.

Questions buyers ask

How long does sampling take?

Samples leave the factory in 7 working days, and each revision round adds about 3 days once you have seen the first piece.

What testing is included?

Standard lots ship with dimensional and hardness reports. SGS documentation is issued with the shipment when your market requires it.

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

Can the specification be held on file?

Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the SGS-compliant build instead of a fresh interpretation.

Ask for the current catalogue and the specification sheet for this line.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top