Welcome to Auto, Motorcycle Parts & Accessories official website!

Off-Road LED Bar Specification Example for Construction Equipment: Load Rated Version

Source:Car Wash Soap Concentrate / Time:2026-09-18

Off-Road LED Bar Specification Example for Construction Equipment: Load Rated Version

This is a worked specification for off-road led bar in a load rated version programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.

The load rated version version exists because the duty cycle on construction equipment is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually documentation that arrived after the container shipped.

Off-Road LED Bar

Example specification

ItemOff-Road LED Bar
ApplicationConstruction Equipment
VersionLoad Rated Version
Base materialSemi-Metallic Compound
Controlled dimensions4 key dimensions, recorded per lot
Tolerance band±0.2 mm
Finishpowder coated
MOQ500 pieces per specification
Sampling10 working days, 3 days per revision
ComplianceECE R90

How the example is built up

  1. Start from the duty cycle, not from the catalogue photograph.
  2. Fix the base material in writing — Semi-Metallic Compound, in this example.
  3. List the dimensions that are actually controlled and the tolerance on each.
  4. Name the finish and what it has to survive.
  5. State the inspection level and who pays when a lot fails.

Off-Road LED Bar example

Processes involved

  • powder coating
  • precision stamping
  • CNC machining
  • injection moulding
  • sintering
  • die casting

Where this example applies

Programmes that run load rated version most often specify this build for construction equipment. Related applications include municipal fleets, assembly programmes, long-haul trucks, export programmes, aftermarket retail.

Checks before packing

  • Dimensional report against the approved drawing.
  • AQL 2.5 sampling on the finished lot.
  • Finish inspection under agreed lighting.
  • Carton drop test on the first lot of a new packing specification.

Questions buyers ask

What testing is included?

Standard lots ship with dimensional and hardness reports. ECE R90 documentation is issued with the shipment when your market requires it.

How long does sampling take?

Samples leave the factory in 10 working days, and each revision round adds about 3 days once you have seen the first piece.

Do you handle mixed containers?

Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 500 pieces per line.

Can the specification be held on file?

Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the ECE R90-compliant build instead of a fresh interpretation.

Ask for the current catalogue and the specification sheet for this line.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top