Welcome to Auto, Motorcycle Parts & Accessories official website!

Tire Balancing Machine Specification Example for Racing Teams: Lightweight Version

Source:Vehicle Interior LED / Time:2026-09-18

Tire Balancing Machine Specification Example for Racing Teams: Lightweight Version

This is a worked specification for tire balancing machine in a lightweight version programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.

The lightweight version version exists because the duty cycle on racing teams is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually a supplier who changed material without saying so.

Tire Balancing Machine

Example specification

ItemTire Balancing Machine
ApplicationRacing Teams
VersionLightweight Version
Base materialSilicone
Controlled dimensions5 key dimensions, recorded per lot
Tolerance band±0.5 mm
Finishzinc plated
MOQ200 pieces per specification
Sampling7 working days, 5 days per revision
ComplianceREACH

How the example is built up

  1. Start from the duty cycle, not from the catalogue photograph.
  2. Fix the base material in writing — Silicone, in this example.
  3. List the dimensions that are actually controlled and the tolerance on each.
  4. Name the finish and what it has to survive.
  5. State the inspection level and who pays when a lot fails.

Tire Balancing Machine example

Processes involved

  • die casting
  • anodising
  • shot blasting
  • electroplating
  • CNC machining
  • gravity casting

Where this example applies

Programmes that run lightweight version most often specify this build for racing teams. Related applications include off-road bikes, workshop replacements, export programmes, long-haul trucks, rental motorcycles.

Checks before packing

  • Dimensional report against the approved drawing.
  • AQL 1.5 sampling on the finished lot.
  • Finish inspection under agreed lighting.
  • Carton drop test on the first lot of a new packing specification.

Questions buyers ask

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

Do you handle mixed containers?

Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 200 pieces per line.

What is the minimum order quantity?

The standard MOQ is 200 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.

How long does sampling take?

Samples leave the factory in 7 working days, and each revision round adds about 5 days once you have seen the first piece.

Send the specification you are working to and we will confirm what we can match, what we would change and why.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top