Vehicle Speedometer Tachometer Specification Example for Construction Equipment: OEM Replacement
Vehicle Speedometer Tachometer Specification Example for Construction Equipment: OEM Replacement
This is a worked specification for vehicle speedometer tachometer in a oem replacement programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.
The oem replacement version exists because the duty cycle on construction equipment is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually a fitment that looked right on paper and failed on the bench.

Example specification
| Item | Vehicle Speedometer Tachometer |
|---|---|
| Application | Construction Equipment |
| Version | OEM Replacement |
| Base material | PVC Coated Fabric |
| Controlled dimensions | 4 key dimensions, recorded per lot |
| Tolerance band | ±0.05 mm |
| Finish | anodised |
| MOQ | 2,000 pieces per specification |
| Sampling | 7 working days, 5 days per revision |
| Compliance | ISO/TS 16949 |
How the example is built up
- Start from the duty cycle, not from the catalogue photograph.
- Fix the base material in writing — PVC Coated Fabric, in this example.
- List the dimensions that are actually controlled and the tolerance on each.
- Name the finish and what it has to survive.
- State the inspection level and who pays when a lot fails.

Processes involved
- heat treatment
- precision stamping
- sintering
- CNC machining
- rubber vulcanisation
- powder coating
Where this example applies
Programmes that run oem replacement most often specify this build for construction equipment. Related applications include utility trailers, boat trailers, racing teams, scooter fleets, long-haul trucks.
Checks before packing
- Dimensional report against the approved drawing.
- AQL 2.5 sampling on the finished lot.
- Finish inspection under agreed lighting.
- Carton drop test on the first lot of a new packing specification.
Questions buyers ask
What testing is included?
Standard lots ship with dimensional and hardness reports. ISO/TS 16949 documentation is issued with the shipment when your market requires it.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
What is the minimum order quantity?
The standard MOQ is 2000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the ISO/TS 16949-compliant build instead of a fresh interpretation.
Share a sample or a drawing and we will quote against a written specification, not against a photograph.



