Welcome to Auto, Motorcycle Parts & Accessories official website!

Train Axle Specification Example for Assembly Programmes: Adjustable Type

Source:Performance Engine Crank / Time:2026-09-18

Train Axle Specification Example for Assembly Programmes: Adjustable Type

This is a worked specification for train axle in a adjustable type programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.

The adjustable type version exists because the duty cycle on assembly programmes is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually lead time that slipped twice before bulk started.

Train Axle

Example specification

ItemTrain Axle
ApplicationAssembly Programmes
VersionAdjustable Type
Base materialPolypropylene
Controlled dimensions4 key dimensions, recorded per lot
Tolerance band±0.1 mm
Finishzinc plated
MOQ1,000 pieces per specification
Sampling7 working days, 5 days per revision
ComplianceREACH

How the example is built up

  1. Start from the duty cycle, not from the catalogue photograph.
  2. Fix the base material in writing — Polypropylene, in this example.
  3. List the dimensions that are actually controlled and the tolerance on each.
  4. Name the finish and what it has to survive.
  5. State the inspection level and who pays when a lot fails.

Train Axle example

Processes involved

  • cold forging
  • surface grinding
  • robot welding
  • ultrasonic cleaning
  • injection moulding
  • CNC machining

Where this example applies

Programmes that run adjustable type most often specify this build for assembly programmes. Related applications include construction equipment, passenger cars, city buses, trailer axles, boat trailers.

Checks before packing

  • Dimensional report against the approved drawing.
  • AQL 4.0 sampling on the finished lot.
  • Finish inspection under agreed lighting.
  • Carton drop test on the first lot of a new packing specification.

Questions buyers ask

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

How is packing specified?

Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.

Can you match an existing sample?

Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.

How long does sampling take?

Samples leave the factory in 7 working days, and each revision round adds about 5 days once you have seen the first piece.

Tell us the model, the fitment and the quantity and we will hold a production slot for you.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top