Welcome to Auto, Motorcycle Parts & Accessories official website!

Airless Spray Gun Specification Example for Utility Trailers: Off-Road Version

Source:Hydraulic Brake / Time:2026-09-18

Airless Spray Gun Specification Example for Utility Trailers: Off-Road Version

This is a worked specification for airless spray gun in a off-road version programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.

The off-road version version exists because the duty cycle on utility trailers is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually a specification nobody had written down.

Airless Spray Gun

Example specification

ItemAirless Spray Gun
ApplicationUtility Trailers
VersionOff-Road Version
Base materialBrass
Controlled dimensions3 key dimensions, recorded per lot
Tolerance band±0.05 mm
Finishpainted
MOQ500 pieces per specification
Sampling7 working days, 3 days per revision
ComplianceTUV

How the example is built up

  1. Start from the duty cycle, not from the catalogue photograph.
  2. Fix the base material in writing — Brass, in this example.
  3. List the dimensions that are actually controlled and the tolerance on each.
  4. Name the finish and what it has to survive.
  5. State the inspection level and who pays when a lot fails.

Airless Spray Gun example

Processes involved

  • injection moulding
  • CNC machining
  • heat treatment
  • rubber vulcanisation
  • powder coating
  • anodising

Where this example applies

Programmes that run off-road version most often specify this build for utility trailers. Related applications include camper conversions, courier fleets, three-wheelers, light trucks, racing teams.

Checks before packing

  • Dimensional report against the approved drawing.
  • AQL 4.0 sampling on the finished lot.
  • Finish inspection under agreed lighting.
  • Carton drop test on the first lot of a new packing specification.

Questions buyers ask

What testing is included?

Standard lots ship with dimensional and hardness reports. TUV documentation is issued with the shipment when your market requires it.

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

Can you match an existing sample?

Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.

How long does sampling take?

Samples leave the factory in 7 working days, and each revision round adds about 3 days once you have seen the first piece.

Share a sample or a drawing and we will quote against a written specification, not against a photograph.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top