Welcome to Auto, Motorcycle Parts & Accessories official website!

Forklift Solid Tires Specification Example for Boat Trailers: Long Life Version

Source:Electric Boat Engine / Time:2026-09-18

Forklift Solid Tires Specification Example for Boat Trailers: Long Life Version

This is a worked specification for forklift solid tires in a long life version programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.

The long life version version exists because the duty cycle on boat trailers is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually documentation that arrived after the container shipped.

Forklift Solid Tires

Example specification

ItemForklift Solid Tires
ApplicationBoat Trailers
VersionLong Life Version
Base materialTempered Glass
Controlled dimensions6 key dimensions, recorded per lot
Tolerance band±0.1 mm
Finishpowder coated
MOQ200 pieces per specification
Sampling10 working days, 3 days per revision
ComplianceECE R90

How the example is built up

  1. Start from the duty cycle, not from the catalogue photograph.
  2. Fix the base material in writing — Tempered Glass, in this example.
  3. List the dimensions that are actually controlled and the tolerance on each.
  4. Name the finish and what it has to survive.
  5. State the inspection level and who pays when a lot fails.

Forklift Solid Tires example

Processes involved

  • laser cutting
  • shot blasting
  • powder coating
  • die casting
  • precision stamping
  • injection moulding

Where this example applies

Programmes that run long life version most often specify this build for boat trailers. Related applications include trailer axles, aftermarket retail, workshop replacements, rental motorcycles, construction equipment.

Checks before packing

  • Dimensional report against the approved drawing.
  • AQL 4.0 sampling on the finished lot.
  • Finish inspection under agreed lighting.
  • Carton drop test on the first lot of a new packing specification.

Questions buyers ask

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

What testing is included?

Standard lots ship with dimensional and hardness reports. ECE R90 documentation is issued with the shipment when your market requires it.

Can you match an existing sample?

Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.

How long does sampling take?

Samples leave the factory in 10 working days, and each revision round adds about 3 days once you have seen the first piece.

Tell us the model, the fitment and the quantity and we will hold a production slot for you.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top