Heat Rejection Tint Specification Example for City Buses: Racing Spec
Heat Rejection Tint Specification Example for City Buses: Racing Spec
This is a worked specification for heat rejection tint in a racing spec programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.
The racing spec version exists because the duty cycle on city buses is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually premature wear on the first batch.

Example specification
| Item | Heat Rejection Tint |
|---|---|
| Application | City Buses |
| Version | Racing Spec |
| Base material | Titanium Alloy |
| Controlled dimensions | 6 key dimensions, recorded per lot |
| Tolerance band | ±0.1 mm |
| Finish | zinc plated |
| MOQ | 1,000 pieces per specification |
| Sampling | 14 working days, 3 days per revision |
| Compliance | DOT |
How the example is built up
- Start from the duty cycle, not from the catalogue photograph.
- Fix the base material in writing — Titanium Alloy, in this example.
- List the dimensions that are actually controlled and the tolerance on each.
- Name the finish and what it has to survive.
- State the inspection level and who pays when a lot fails.

Processes involved
- ultrasonic cleaning
- anodising
- precision stamping
- shot blasting
- powder coating
- CNC machining
Where this example applies
Programmes that run racing spec most often specify this build for city buses. Related applications include export programmes, utility trailers, off-road bikes, dealership service, passenger cars.
Checks before packing
- Dimensional report against the approved drawing.
- AQL 1.5 sampling on the finished lot.
- Finish inspection under agreed lighting.
- Carton drop test on the first lot of a new packing specification.
Questions buyers ask
How long does sampling take?
Samples leave the factory in 14 working days, and each revision round adds about 3 days once you have seen the first piece.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
What testing is included?
Standard lots ship with dimensional and hardness reports. DOT documentation is issued with the shipment when your market requires it.
Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.



