Automatic Lubrication System Specification Example for Camper Conversions: Standard Replacement
Automatic Lubrication System Specification Example for Camper Conversions: Standard Replacement
This is a worked specification for automatic lubrication system in a standard replacement programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.
The standard replacement version exists because the duty cycle on camper conversions is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually inconsistent hardness between lots.

Example specification
| Item | Automatic Lubrication System |
|---|---|
| Application | Camper Conversions |
| Version | Standard Replacement |
| Base material | Nylon 66 |
| Controlled dimensions | 6 key dimensions, recorded per lot |
| Tolerance band | ±0.5 mm |
| Finish | powder coated |
| MOQ | 2,000 pieces per specification |
| Sampling | 14 working days, 3 days per revision |
| Compliance | ISO/TS 16949 |
How the example is built up
- Start from the duty cycle, not from the catalogue photograph.
- Fix the base material in writing — Nylon 66, in this example.
- List the dimensions that are actually controlled and the tolerance on each.
- Name the finish and what it has to survive.
- State the inspection level and who pays when a lot fails.

Processes involved
- heat treatment
- anodising
- CNC machining
- powder coating
- assembly line testing
- cold forging
Where this example applies
Programmes that run standard replacement most often specify this build for camper conversions. Related applications include emergency vehicles, trailer axles, fleet maintenance, agricultural trailers, off-road bikes.
Checks before packing
- Dimensional report against the approved drawing.
- AQL 2.5 sampling on the finished lot.
- Finish inspection under agreed lighting.
- Carton drop test on the first lot of a new packing specification.
Questions buyers ask
What testing is included?
Standard lots ship with dimensional and hardness reports. ISO/TS 16949 documentation is issued with the shipment when your market requires it.
What is the minimum order quantity?
The standard MOQ is 2000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
How long does sampling take?
Samples leave the factory in 14 working days, and each revision round adds about 3 days once you have seen the first piece.
Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.