Welcome to Auto, Motorcycle Parts & Accessories official website!

CV Joint Drive Shaft Specification Example for Assembly Programmes: OEM Replacement

Source:Honeywell Other Parts Accessories / Time:2026-09-18

CV Joint Drive Shaft Specification Example for Assembly Programmes: OEM Replacement

This is a worked specification for cv joint drive shaft in a oem replacement programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.

The oem replacement version exists because the duty cycle on assembly programmes is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually a fitment that looked right on paper and failed on the bench.

CV Joint Drive Shaft

Example specification

ItemCV Joint Drive Shaft
ApplicationAssembly Programmes
VersionOEM Replacement
Base materialReinforced Nylon
Controlled dimensions6 key dimensions, recorded per lot
Tolerance band±0.5 mm
Finishpowder coated
MOQ200 pieces per specification
Sampling10 working days, 3 days per revision
ComplianceRoHS

How the example is built up

  1. Start from the duty cycle, not from the catalogue photograph.
  2. Fix the base material in writing — Reinforced Nylon, in this example.
  3. List the dimensions that are actually controlled and the tolerance on each.
  4. Name the finish and what it has to survive.
  5. State the inspection level and who pays when a lot fails.

CV Joint Drive Shaft example

Processes involved

  • shot blasting
  • gravity casting
  • electroplating
  • heat treatment
  • surface grinding
  • assembly line testing

Where this example applies

Programmes that run oem replacement most often specify this build for assembly programmes. Related applications include fleet maintenance, rental motorcycles, trailer axles, municipal fleets, three-wheelers.

Checks before packing

  • Dimensional report against the approved drawing.
  • AQL 4.0 sampling on the finished lot.
  • Finish inspection under agreed lighting.
  • Carton drop test on the first lot of a new packing specification.

Questions buyers ask

Can the specification be held on file?

Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the RoHS-compliant build instead of a fresh interpretation.

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

Do you handle mixed containers?

Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 200 pieces per line.

How long does sampling take?

Samples leave the factory in 10 working days, and each revision round adds about 3 days once you have seen the first piece.

Tell us the model, the fitment and the quantity and we will hold a production slot for you.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top