Welcome to Auto, Motorcycle Parts & Accessories official website!

Engine Oil Sump Specification Example for Off-Road Bikes: OEM Replacement

Source:Adaptive Cruise Control Sensor / Time:2026-09-18

Engine Oil Sump Specification Example for Off-Road Bikes: OEM Replacement

This is a worked specification for engine oil sump in a oem replacement programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.

The oem replacement version exists because the duty cycle on off-road bikes is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually premature wear on the first batch.

Engine Oil Sump

Example specification

ItemEngine Oil Sump
ApplicationOff-Road Bikes
VersionOEM Replacement
Base materialPolypropylene
Controlled dimensions5 key dimensions, recorded per lot
Tolerance band±0.5 mm
Finishanodised
MOQ200 pieces per specification
Sampling14 working days, 3 days per revision
ComplianceISO/TS 16949

How the example is built up

  1. Start from the duty cycle, not from the catalogue photograph.
  2. Fix the base material in writing — Polypropylene, in this example.
  3. List the dimensions that are actually controlled and the tolerance on each.
  4. Name the finish and what it has to survive.
  5. State the inspection level and who pays when a lot fails.

Engine Oil Sump example

Processes involved

  • surface grinding
  • CNC machining
  • gravity casting
  • ultrasonic cleaning
  • rubber vulcanisation
  • robot welding

Where this example applies

Programmes that run oem replacement most often specify this build for off-road bikes. Related applications include construction equipment, long-haul trucks, workshop replacements, delivery vans, rental motorcycles.

Checks before packing

  • Dimensional report against the approved drawing.
  • AQL 2.5 sampling on the finished lot.
  • Finish inspection under agreed lighting.
  • Carton drop test on the first lot of a new packing specification.

Questions buyers ask

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

Do you handle mixed containers?

Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 200 pieces per line.

How long does sampling take?

Samples leave the factory in 14 working days, and each revision round adds about 3 days once you have seen the first piece.

How is packing specified?

Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.

Share a sample or a drawing and we will quote against a written specification, not against a photograph.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top