Welcome to Auto, Motorcycle Parts & Accessories official website!

Aircraft Turbocharger Specification Example for Racing Teams: Two-Piece Construction

Source:Industrial Timing Pulley / Time:2026-09-18

Aircraft Turbocharger Specification Example for Racing Teams: Two-Piece Construction

This is a worked specification for aircraft turbocharger in a two-piece construction programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.

The two-piece construction version exists because the duty cycle on racing teams is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually warranty claims traced back to a single lot.

Aircraft Turbocharger

Example specification

ItemAircraft Turbocharger
ApplicationRacing Teams
VersionTwo-Piece Construction
Base materialABS Plastic
Controlled dimensions6 key dimensions, recorded per lot
Tolerance band±0.05 mm
Finishanodised
MOQ1,000 pieces per specification
Sampling14 working days, 3 days per revision
ComplianceCCC

How the example is built up

  1. Start from the duty cycle, not from the catalogue photograph.
  2. Fix the base material in writing — ABS Plastic, in this example.
  3. List the dimensions that are actually controlled and the tolerance on each.
  4. Name the finish and what it has to survive.
  5. State the inspection level and who pays when a lot fails.

Aircraft Turbocharger example

Processes involved

  • shot blasting
  • die casting
  • CNC machining
  • surface grinding
  • robot welding
  • gravity casting

Where this example applies

Programmes that run two-piece construction most often specify this build for racing teams. Related applications include passenger cars, long-haul trucks, delivery vans, fleet maintenance, courier fleets.

Checks before packing

  • Dimensional report against the approved drawing.
  • AQL 4.0 sampling on the finished lot.
  • Finish inspection under agreed lighting.
  • Carton drop test on the first lot of a new packing specification.

Questions buyers ask

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

What testing is included?

Standard lots ship with dimensional and hardness reports. CCC documentation is issued with the shipment when your market requires it.

How long does sampling take?

Samples leave the factory in 14 working days, and each revision round adds about 3 days once you have seen the first piece.

Can you match an existing sample?

Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.

Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top