Engine Oil Sump Specification Example for Delivery Vans: Drilled and Slotted
Engine Oil Sump Specification Example for Delivery Vans: Drilled and Slotted
This is a worked specification for engine oil sump in a drilled and slotted programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.
The drilled and slotted version exists because the duty cycle on delivery vans is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually a supplier who changed material without saying so.

Example specification
| Item | Engine Oil Sump |
|---|---|
| Application | Delivery Vans |
| Version | Drilled and Slotted |
| Base material | Stainless Steel |
| Controlled dimensions | 3 key dimensions, recorded per lot |
| Tolerance band | ±0.5 mm |
| Finish | as machined |
| MOQ | 500 pieces per specification |
| Sampling | 14 working days, 5 days per revision |
| Compliance | ECE R90 |
How the example is built up
- Start from the duty cycle, not from the catalogue photograph.
- Fix the base material in writing — Stainless Steel, in this example.
- List the dimensions that are actually controlled and the tolerance on each.
- Name the finish and what it has to survive.
- State the inspection level and who pays when a lot fails.

Processes involved
- assembly line testing
- ultrasonic cleaning
- electroplating
- die casting
- CNC machining
- heat treatment
Where this example applies
Programmes that run drilled and slotted most often specify this build for delivery vans. Related applications include three-wheelers, assembly programmes, construction equipment, utility trailers, boat trailers.
Checks before packing
- Dimensional report against the approved drawing.
- AQL 1.5 sampling on the finished lot.
- Finish inspection under agreed lighting.
- Carton drop test on the first lot of a new packing specification.
Questions buyers ask
How long does sampling take?
Samples leave the factory in 14 working days, and each revision round adds about 5 days once you have seen the first piece.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the ECE R90-compliant build instead of a fresh interpretation.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
Ask for the current catalogue and the specification sheet for this line.



