Welcome to Auto, Motorcycle Parts & Accessories official website!

Airless Spray Gun Specification Example for Scooter Fleets: Two-Piece Construction

Source:Snow Chains For Tires / Time:2026-09-18

Airless Spray Gun Specification Example for Scooter Fleets: Two-Piece Construction

This is a worked specification for airless spray gun in a two-piece construction programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.

The two-piece construction version exists because the duty cycle on scooter fleets is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually a specification nobody had written down.

Airless Spray Gun

Example specification

ItemAirless Spray Gun
ApplicationScooter Fleets
VersionTwo-Piece Construction
Base materialTempered Glass
Controlled dimensions5 key dimensions, recorded per lot
Tolerance band±0.2 mm
Finishas machined
MOQ3,000 pieces per specification
Sampling14 working days, 5 days per revision
ComplianceTUV

How the example is built up

  1. Start from the duty cycle, not from the catalogue photograph.
  2. Fix the base material in writing — Tempered Glass, in this example.
  3. List the dimensions that are actually controlled and the tolerance on each.
  4. Name the finish and what it has to survive.
  5. State the inspection level and who pays when a lot fails.

Airless Spray Gun example

Processes involved

  • gravity casting
  • surface grinding
  • electroplating
  • precision stamping
  • rubber vulcanisation
  • shot blasting

Where this example applies

Programmes that run two-piece construction most often specify this build for scooter fleets. Related applications include assembly programmes, off-road bikes, utility trailers, export programmes, camper conversions.

Checks before packing

  • Dimensional report against the approved drawing.
  • AQL 4.0 sampling on the finished lot.
  • Finish inspection under agreed lighting.
  • Carton drop test on the first lot of a new packing specification.

Questions buyers ask

Can you match an existing sample?

Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

How long does sampling take?

Samples leave the factory in 14 working days, and each revision round adds about 5 days once you have seen the first piece.

How is packing specified?

Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.

Tell us the model, the fitment and the quantity and we will hold a production slot for you.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top