Welcome to Auto, Motorcycle Parts & Accessories official website!

Steel Spoke Specification Example for Assembly Programmes: Fixed Type

Source:Replacement Windshields / Time:2026-09-18

Steel Spoke Specification Example for Assembly Programmes: Fixed Type

This is a worked specification for steel spoke in a fixed type programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.

The fixed type version exists because the duty cycle on assembly programmes is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually a supplier who changed material without saying so.

Steel Spoke

Example specification

ItemSteel Spoke
ApplicationAssembly Programmes
VersionFixed Type
Base materialHigh Density Foam
Controlled dimensions6 key dimensions, recorded per lot
Tolerance band±0.2 mm
Finishpainted
MOQ3,000 pieces per specification
Sampling10 working days, 5 days per revision
ComplianceISO/TS 16949

How the example is built up

  1. Start from the duty cycle, not from the catalogue photograph.
  2. Fix the base material in writing — High Density Foam, in this example.
  3. List the dimensions that are actually controlled and the tolerance on each.
  4. Name the finish and what it has to survive.
  5. State the inspection level and who pays when a lot fails.

Steel Spoke example

Processes involved

  • heat treatment
  • sintering
  • assembly line testing
  • die casting
  • cold forging
  • surface grinding

Where this example applies

Programmes that run fixed type most often specify this build for assembly programmes. Related applications include passenger cars, workshop replacements, boat trailers, export programmes, agricultural trailers.

Checks before packing

  • Dimensional report against the approved drawing.
  • AQL 1.5 sampling on the finished lot.
  • Finish inspection under agreed lighting.
  • Carton drop test on the first lot of a new packing specification.

Questions buyers ask

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

Can the specification be held on file?

Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the ISO/TS 16949-compliant build instead of a fresh interpretation.

Can you match an existing sample?

Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.

How long does sampling take?

Samples leave the factory in 10 working days, and each revision round adds about 5 days once you have seen the first piece.

Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top